STAGE 2 PROJECT APPROVAL
-
Environmental Assessment - Table of Contents
2.79 MB | pdf -
Environmental Assessment - Executive Summary
591 kB | pdf -
Environmental Assessment - Abbreviations
306 kB | pdf -
Environmental Assessment - Glossary
287 kB | pdf -
Environmental Assessment - Section 1 - Introduction
482 kB | pdf -
Environmental Assessment - Section 5 - Impact Assessment
4.71 MB | pdf -
Environmental Assessment - Section 8 - References
268 kB | pdf -
Plan 02A - Land Ownership Details
19 kB | pdf -
Plan 03 - Approved Stage 1 General Arrangement
1.19 MB | pdf -
Plan 04 - Proposed Stage 2 General Arrangement
1.54 MB | pdf -
Plan 05 - Proposed Open Cut 4 Mine Layout at Year 2
1.09 MB | pdf -
Plan 06 - Proposed Open Cut 4 Mine Layout at Year 7
1.07 MB | pdf -
Plan 07 - Proposed Open Cut Mine Layout at Year 12
1.07 MB | pdf -
Plan 08 - Proposed Open Cut 4 Mine Layout at Year 16
1.09 MB | pdf -
Plan 09 - Proposed Open Cut Mine Layout at Year 19
1.09 MB | pdf -
Plan 10 - Proposed Open Cut Mine Layout at Year 24
1.11 MB | pdf -
Plan 11 - Underground No.1 and No.2 Mining Schedule
1.5 MB | pdf -
Plan 14 - Plan and Elevation of the Stage 2 Facilities
2.63 MB | pdf -
Plan 15 - Water Management Strategy
376 kB | pdf -
Plan 29 - Water Census Location
1.09 MB | pdf -
Plan 30 - Hydrogeological Units and Piezometers
2.95 MB | pdf -
Plan 34 - Catchment Surface Water Hydrology
667 kB | pdf -
Plan 36 - Surface Water Management for Years 1-2
1.08 MB | pdf -
Plan 37 - Surface Water Management for Year 12
1.08 MB | pdf -
Plan 38 - Surface Water Management for Year 19
1.24 MB | pdf -
Plan 39 - Surface Water Management for Year 24
1.18 MB | pdf -
Plan 43 - Broad Vegetation Communities
1.19 MB | pdf -
Plan 44 - Threatened Flora Species of the Locality
118 kB | pdf -
Plan 45 - Threatened Fauna Species of the Locality
133 kB | pdf -
Plan 49 - Aboriginal Heritage Locations
1.47 MB | pdf -
Plan 50 - European Heritage Location
517 kB | pdf -
Plan 51 - Soil Type Boundaries
989 kB | pdf -
Plan 52 - Land Capability
952 kB | pdf -
Plan 53 - Agricultural Suitability
992 kB | pdf -
Plan 54 - Conceptual Post Mining Landscape
605 kB | pdf -
Plan 55 - Connectivity, Conservation and Dedication
551 kB | pdf -
Appendix 01A - Land Schedule
2.87 MB | pdf -
Appendix 01B - Director General's Requirements – Stage 2
3.62 MB | pdf -
Appendix 02A - MCP Newsletters 1 to 6
5.25 MB | pdf -
Appendix 02B - Mine Dust Fact Sheet
231 kB | pdf -
Appendix 03A - Air Quality Assessment 09
5.92 MB | pdf -
Appendix 03B - Greenhouse Gas Report
359 kB | pdf -
Appendix 04 - Noise and Vibration Impact Assessment
22.7 MB | pdf -
Appendix 06B - Revised Water Balance
846 kB | pdf -
Appendix 07 - Ecological Impact Assessment
12.3 MB | pdf -
Appendix 08 - Subsidence
13.8 MB | pdf -
Appendix 09 - Aboriginal Cultural Heritage Assessment
38.8 MB | pdf -
Appendix 10 - European Heritage
3.42 MB | pdf -
Appendix 11 - Soils
12.4 MB | pdf -
Appendix 12 - Road Traffic Report
1.45 MB | pdf -
Appendix 13 - Rail Traffic Report
4.2 MB | pdf -
Appendix 14 - Visuals Report
1.41 MB | pdf -
Appendix 15 - Economics
568 kB | pdf -
Appendix 16 - Preliminary Hazard Analysis
2.29 MB | pdf -
Appendix 17 - Geo-Chemical Assessment
2.65 MB | pdf -
Preferred Project Report - Main Report - Part A
16 MB | pdf -
Preferred Project Report - Main Report - Part B
13.6 MB | pdf -
PPR Appendix A - Table of Submissions
327 kB | pdf -
PPR Appendix B - Stakeholder Consultation
460 kB | pdf -
PPR Appendix C - Air Quality Impact Assessment
5.43 MB | pdf -
PPR Appendix D - Environmental Noise Assessment
2.27 MB | pdf -
PPR Appendix E - Groundwater Impact Assessment - Part B
14.8 MB | pdf -
PPR Appendix F - Supplementary Surface Water Strategy
1.06 MB | pdf -
PPR Appendix H - Biodiversity Offsets Strategy
7.03 MB | pdf -
PPR Appendix I - Subsidence Impact Assessment
10.6 MB | pdf -
PPR Appendix K - Rehabilitation Strategy
6.46 MB | pdf -
Planning & Assessment Commission Review Report
3.67 MB | pdf -
Response to PAC Review
936 kB | pdf
-
Environmental Assessment - Table of Contents
-
Environmental Assessment - Executive Summary
-
Environmental Assessment - Abbreviations
-
Environmental Assessment - Glossary
-
Environmental Assessment - Section 1 - Introduction
-
Environmental Assessment - Section 2 - Project Approval Framework
-
Environmental Assessment - Section 3 - Stakeholder and Community Consultation
-
Environmental Assessment - Section 4 - Project Description
-
Environmental Assessment - Section 5 - Impact Assessment
-
Environmental Assessment - Section 6 - Statement of Commitments by MCM
-
Environmental Assessment - Section 7 - Project Justification
-
Environmental Assessment - Section 8 - References
-
Plan 1 - Regional Setting of the Moolarben Coal Project
-
Plan 2 - Local Setting of the Proposed Stage 2 Project and Property Ownership
-
Plan 02A - Land Ownership Details
-
Plan 03 - Approved Stage 1 General Arrangement
-
Plan 04 - Proposed Stage 2 General Arrangement
-
Plan 05 - Proposed Open Cut 4 Mine Layout at Year 2
-
Plan 06 - Proposed Open Cut 4 Mine Layout at Year 7
-
Plan 07 - Proposed Open Cut Mine Layout at Year 12
-
Plan 08 - Proposed Open Cut 4 Mine Layout at Year 16
-
Plan 09 - Proposed Open Cut Mine Layout at Year 19
-
Plan 10 - Proposed Open Cut Mine Layout at Year 24
-
Plan 11 - Underground No.1 and No.2 Mining Schedule
-
Plan 12 - Moolarben Coal Project Main Infrastructure Areas
-
Plan 13 - Elevations of the Stage 2 Infrastructure Area
-
Plan 14 - Plan and Elevation of the Stage 2 Facilities
-
Plan 15 - Water Management Strategy
-
Plan 16 - Environmental Monitoring and Weather Station Locations
-
Plan 17 - Year 2 - Predicted Annual Average PM10 Dust Emissions (cumulative)
-
Plan 18 - Year 7 - Predicted Annual Average PM10 Dust Emissions (cumulative)
-
Plan 19 - Year 12 - Predicted Annual Average PM10 Dust Emissions (cumulative)
-
Plan 20 - Year 16 - Predicted Annual Average PM10 Dust Emissions (cumulative)
-
Plan 21 - Year 19 - Predicted Annual Average PM10 Dust Emissions (cumulative)
-
Plan 22 - Year 24 - Predicted Annual Average PM10 Dust Emissions (cumulative)
-
Plan 23 - Year 2 - Predicted Noise Contours LAeq(15 minute) - ENE Wind
-
Plan 24 - Year 7 - Predicted Noise Contours LAeq(15 minute) - ENE Wind
-
Plan 25 - Year 12 - Predicted Noise Contours LAeq(15 minute) - ENE Wind
-
Plan 26 - Year 16 - Predicted Noise Contours LAeq(15 minute) - ENE Wind
-
Plan 27 - Year 19 - Predicted Noise Contours LAeq(15 minute) - ENE Wind
-
Plan 28 - Year 24 - Predicted Noise Contours LAeq(15 minute) - ENE Wind
-
Plan 29 - Water Census Location
-
Plan 30 - Hydrogeological Units and Piezometers
-
Plan 31 - Proposed Borefield Layout for Stages 1 and 2
-
Plan 32 - Groundwater Conceptual Model and Boundary Conditions
-
Plan 33 - Predicted Drawdowns in the Ulan Seam at Completion of Mining
-
Plan 34 - Catchment Surface Water Hydrology
-
Plan 35 - Surface Water Management of the Infrastructure Area
-
Plan 36 - Surface Water Management for Years 1-2
-
Plan 37 - Surface Water Management for Year 12
-
Plan 38 - Surface Water Management for Year 19
-
Plan 39 - Surface Water Management for Year 24
-
Plan 40 - Cross Sections of Post Mining Creek Alignments
-
Plan 41 - Cross Section of Typical Creek Riffle Structure
-
Plan 42 - Endangered Ecological Communities within Study Area
-
Plan 43 - Broad Vegetation Communities
-
Plan 44 - Threatened Flora Species of the Locality
-
Plan 45 - Threatened Fauna Species of the Locality
-
Plan 46 - Slopes and Cliff Lines Above Underground No.1 and Underground No.2
-
Plan 47 - Heritage Sites and Survey Marks above Underground No.1 and Underground No.2
-
Plan 48 - Predicted Subsidence Levels for Underground No.1 and Underground No.2
-
Plan 49 - Aboriginal Heritage Locations
-
Plan 50 - European Heritage Location
-
Plan 51 - Soil Type Boundaries
-
Plan 52 - Land Capability
-
Plan 53 - Agricultural Suitability
-
Plan 54 - Conceptual Post Mining Landscape
-
Plan 55 - Connectivity, Conservation and Dedication
-
Appendix 01A - Land Schedule
-
Appendix 01B - Director General's Requirements – Stage 2
-
Appendix 01C - Director General's Requirements – 05 0117 MOD3
-
Appendix 02A - MCP Newsletters 1 to 6
-
Appendix 02B - Mine Dust Fact Sheet
-
Appendix 03A - Air Quality Assessment 09
-
Appendix 03B - Greenhouse Gas Report
-
Appendix 04 - Noise and Vibration Impact Assessment
-
Appendix 06B - Revised Water Balance
-
Appendix 07 - Ecological Impact Assessment
-
Appendix 08 - Subsidence
-
Appendix 09 - Aboriginal Cultural Heritage Assessment
-
Appendix 10 - European Heritage
-
Appendix 11 - Soils
-
Appendix 12 - Road Traffic Report
-
Appendix 13 - Rail Traffic Report
-
Appendix 14 - Visuals Report
-
Appendix 15 - Economics
-
Appendix 16 - Preliminary Hazard Analysis
-
Appendix 17 - Geo-Chemical Assessment
-
Preferred Project Report - Main Report - Part A
-
Preferred Project Report - Main Report - Part B
-
PPR Appendix A - Table of Submissions
-
PPR Appendix B - Stakeholder Consultation
-
PPR Appendix C - Air Quality Impact Assessment
-
PPR Appendix D - Environmental Noise Assessment
-
PPR Appendix E - Groundwater Impact Assessment - Part A
-
PPR Appendix E - Groundwater Impact Assessment - Part B
-
PPR Appendix F - Supplementary Surface Water Strategy
-
PPR Appendix G - Conceptual Design for Proposed Diversions of Murragamba & Eastern Creeks
-
PPR Appendix H - Biodiversity Offsets Strategy
-
PPR Appendix I - Subsidence Impact Assessment
-
PPR Appendix J - Aboriginal Archaeology and Cultural Heritage Addendum
-
PPR Appendix K - Rehabilitation Strategy
-
Response to Submissions on Preferred Project Report - Part A
-
Response to Submissions on Preferred Project Report - Part B
-
Planning & Assessment Commission Review Report
-
Response to PAC Review
-
Planning & Assessment Commission Determination Report